Massive modules for LNG project

Being considered a logistics partner by the client, Best Global Logistics was asked to manage the movement of multiple large modules to a floating storage and regasification unit (FSRU).

BGL braced itself for a tough challenge when accepting the task to move modules of nearly 1500 tons from a yard in China to Keppel Shipyard in Singapore. The shipments were facing major challenges due to Covid-19, a chaotic shipping market, the Lunar New Year, technical complexities and very short time windows. However, these exact types of jobs are exactly why Best Global Logistics is considered the most suitable partner for the project, as a highly engaged and experienced project team is needed.

Motivated by the trust of the client, BGL designed and engineered the best solutions, engaged a reliable Marine Warranty Surveyor and successfully transported the modules on specialized heavy lift vessels with the fastest transit that could be possibly achieved. The transport included a 500 ton Regas Module and a 900 ton Power Module rising more than 34 meters high. 

Share: 

Related cases